Skip to main content

Wastewater

  • Webpage

    Joint DNR/DSPS Plan Review Procedures For Large POWTS

    Private Onsite Wastewater Treatment Systems (POWTS) that are determined to be "large" will be subject to a joint plan review conducted by the DNR and the Department of Safety and Professional Services (DSPS) and will receive Wisconsin Pollutant…

  • Webpage

    Interagency wastewater systems plan review

    Plans for Private Onsite Wastewater Treatment Systems (POWTS) are subject to review by the Department of Safety and Professional Services (DSPS), or may require a joint review by the DNR and DSPS.

  • Webpage

    Regulating water intake structures

    Section 316(b) of the federal Clean Water Act requires, and Section 283.31(6), Wis. Stats., allows the department to require that the location, design, construction and capacity of cooling water intake structures reflect the best technology…

  • Webpage

    Holding Tanks for Non-Domestic Wastewater

    Wastewaters originating from plumbing fixtures and appliances such as sanitary (toilets), bath, laundry, dish washing, garbage disposal and cleaning wastewaters are defined as domestic wastewater. Wastewater from restaurants is also generally…

  • Webpage

    Water Quality Program Policy and Guidance

    Guidance Available for Comment We welcome your input on all proposed Water Quality program guidance. The following table lists guidance that is being developed or revised. Feedback related to the documents posted below should be emailed to staff…

  • Webpage

    Wastewater General Permits

    The Wisconsin Department of Natural Resources (DNR) is authorized under Section 283.35, Wis. Stats. [exit DNR], to issue Wisconsin Pollutant Discharge Elimination System (WPDES) general permits to a designated area of the state authorizing…

  • Webpage

    Summary of January 2005 Government Accountability Office (GAO) Findings on Wastewater System Funding Recommendations for Security Improvements

    The federal Senate Environment Committee asked the Government Accountability Office (GAO) to identify how wastewater security measures should be prioritized and funded. The final report was issued in January 2005. A summary of the findings are:

  • Webpage

    Types of WPDES Permits

    Industrial wastewater discharge The DNR administers 38 major industrial permits issued primarily to paper mills and steam electric facilities. Major industrial permits are issued for industries with significant wastewater volumes which can impact…

  • Webpage

    Definition of large Private Onsite Wastewater Treatment System (POWTS)

    The definition for a "Private Onsite Wastewater Treatment System" (POWTS), in s. Comm 81.01(194), Wis. Adm. Code, states that a POWTS has the same meaning as that given for a "private sewage system" defined under s. 145.01 (12), Wis. Stats. The…

  • Webpage

    References for operation and maintenance of sanitary sewer collection systems

    Sanitary sewer collection systems are critical parts of the wastewater treatment process. Collection systems represent major capital investments for communities. Sewer pipes and pumping stations deteriorate through normal use and age. Proper…

Subscribe to Wastewater