This is a routine meeting of the team developing the WDNR Technical Standards 1011 and 1012 for Dry Storm Water Basins and Enhanced Dry Treatment System.
This is a meeting of the technical stakeholder team that is developing DNR Technical Standards 1011 Dry Storm Water Basins and 1012 Enhanced Dry Treatment System.
This is a meeting of the work team that is developing DNR Technical Standards 1011 and 1012 for Dry Storm Water Basins and Enhanced Dry Treatment System, respectively.