Construction

  • Webpage

    Recarga Model

    This section is intended for use by highly technical professionals. Use the links below to download Recarga Model v. 2.3 and the user manual. This model is used for evaluating the performance of bioretention facilities, rain gardens and…

  • Webpage

    Storm water post-construction technical standards

    Storm water construction technical standards are documents that specify the minimum requirements needed to plan, design, install and maintain a wide array of conservation practices aimed at preserving the land and water resources of Wisconsin during…

  • Webpage

    MS4 modeling guidance

    This section is intended for use by highly technical professionals. Download the modeling guidance developed for municipalities permitted under the Municipal Separate Storm Sewer System (MS4) WPDES program. The guidance discusses minimum pollutant…

  • Webpage

    Groundwater Mounding Calculations

    This section is intended for use by highly technical professionals. Find additional information concerning the design and management of artificial recharge systems and their effect on groundwater levels:

  • Webpage

    Storm water construction technical standards

    Storm water construction technical standards are documents that specify the minimum requirements needed to plan, design, install and maintain a wide array of conservation practices aimed at preserving the land and water resources of Wisconsin…

  • Webpage

    Storm Water Technical Standards, Models and BMPs

    Use these technical standards to plan, design, install, and maintain erosion/sediment control and storm water management practices to comply with ch. NR 151, Wis. Adm. Code [exit DNR].

  • Webpage

    Storm water practices presentations and information

    These presentations and fact sheets contain the following information on: Storm water practices to control construction site soil erosion and storm water runoff during construction; and Storm water management practices after construction is…

  • Webpage

    Construction site storm water permit overview

    Landowners of most construction projects where one or more acres of land will be disturbed must submit an application called a Notice of Intent (NOI) to request coverage under the Construction Site Storm Water Runoff General Permit No. WI-…

  • Webpage

    Construction site storm water permit forms

    Landowners must submit a Notice of Intent (NOI) to obtain construction site storm water permit coverage from DNR. Signing the NOI is also a certification that an applicant has read, understands and will implement the erosion control and storm…