Waterway and Wetland Projects on Public Notice
Public notices are required by statute to alert interested members of the public of the DNR's intention to authorize a Wisconsin Waterway or Wetland individual permit. The public notice for an individual permit application is posted here for 60 days and published once in the legal notices section of the local newspaper closest to the proposed project site. The notice identifies the applicant, location, proposed activities and the proposed impacts to navigable waterways or wetlands.
Submit Public Comments
The public notice document for each application summarizes the project and explains how to submit public comments on the proposed project. A member of the public may submit written comments or request that the department hold a public informational hearing. A request for a public informational hearing must be submitted within 20 days of the posting date of the public notice. Public comments must be submitted within 30 days from the posting date of the public notice unless otherwise indicated in the notice. If a public informational hearing is requested, the public comment period is then extended to 10 days after the date of the hearing.
Public participation procedures are detailed in NR 300, Wis. Adm. Code [PDF exit DNR].
Permit Application Documents
To view a public notice, click on the link in the Application column and open the file with "Public Notice" or "NOPA" in the title. Application materials for the proposed project, including narrative, maps, plans and specifications, etc., can be also accessed and reviewed.
Project Name | Applicant | County | Public Notice | Application |
---|---|---|---|---|
Shippy Park Unnamed Tributary Dredging | Brandon Holewinski, Village of Pulaski | Brown | 4/10/2025 | WP-IP-NE-2025-5-X03-14T06-10-38 |
Maple Ridge Dairy - Updated | Brian Forrest | Marathon | 4/5/2025 | WP-IP-WC-2025-37-X03-04T10-48-31 |
HC Wyeville Operating LLC - Phase 13 | Dick Reesman, HC Wyeville Operating LLC | Monroe | 4/4/2025 | WP-IP-WC-2025-42-X02-17T13-22-06 |
Huelskamp | John Huelskamp | Walworth | 4/3/2025 | WP-IP-SE-2025-65-X03-12T14-25-47 |
Brandenburg | Bill Brandenburg | Walworth | 4/3/2025 | WP-IP-SE-2025-65-X03-12T11-43-01 |
Veterans Freedom Park And Veterans Point Marina Dredge Project | James Flottmeyer | La Crosse | 4/3/2025 | WP-IP-WC-2025-32-X03-06T15-53-36 |
343 Sheridan Rd Bluff Maintenance | Dimitri Fridman | Kenosha | 3/31/2025 | WP-IP-SE-2025-30-X01-10T16-57-41 |
City of Wausau Washington Street Retaining Wall | Ben Everswick | Marathon | 3/27/2025 | WP-IP-WC-2025-37-X02-06T08-32-50 |
Thies Riprap | David Thies | Brown | 3/25/2025 | WP-IP-NE-2025-5-X02-27T10-37-45 |
Roalkvan | Jane Roalkvan | Door | 3/22/2025 | WP-IP-NE-2025-15-X01-22T13-03-06 |
Village of Sister Bay Swimming Dock Repair | Erik Linczmaier, Village of Sister Bay | Door | 3/22/2025 | WP-IP-NE-2024-15-X10-14T16-59-54 |
Onanguisse Estates Condominium Association Footbridge | Paul Fontecchio | Door | 3/20/2025 | WP-IP-NE-2025-15-X02-28T13-07-10 |
Merkatoris | Michael & Ingrid Merkatoris Trust | Door | 3/20/2025 | WP-IP-NE-2024-15-X11-27T12-15-13 |
2025 Area 7 Flood Mitigation Channel and Storage Improvements | Cali Bonie | Waukesha | 3/17/2025 | WP-IP-SE-2025-68-X02-12T18-35-13 |
2024 Area 7 Flood Mitigation Storm Sewer Improvements | Cali Bonie | Waukesha | 3/17/2025 | WP-IP-SE-2024-68-X10-31T17-10-50 |
Acewood Pond Outfall Dredge | Carissa Wegner, Jim Wolfe | Dane | 3/13/2025 | WP-IP-SC-2025-13-X02-25T14-21-39 |
Baxa | Luke Blaser | Kenosha | 3/6/2025 | WP-IP-SE-2025-30-X02-03T14-02-08 |
Waterway and Wetland Individual Permit Review Process
- Applicants use the DNR Water ePermitting System to submit an individual permit application.
- The DNR has 30 days to review the application for completeness and notify the applicant. The DNR can request additional information one time within these 30 days, which would pause the 30-day period until all information requested is received.
- The DNR has 15 days to publish the public notice on its website and notify interested parties as determined under s. NR 300.07 (5), Wis. Adm. Code.
- The DNR provides a public comment period of at least 30 days.
- Any member of the public or the DNR may request a public informational hearing within 20 days of the public notice publishing date.
- If a public hearing is requested, the DNR has 15 days to provide public notice of the hearing and will hold a hearing within 30 days of the hearing notice.
- The public comment period will end either 30 days after the public notice publishing date or 10 days after the public informational hearing.
- The DNR typically has 30 days from the end of the public comment period if no public hearing was requested or 20 days from the public hearing date to communicate a decision to the applicant about the permit application.