We Energies-Oak Creek Power Plant, located at 11060 S Chicago Rd, Oak Creek, Milwaukee County, Wisconsin, FID 241007690, submitted to the Department of Natural Resources (DNR) a permit application, including plans and specifications for revision of…
Superior Refining Company LLC, located at 2407 Stinson Ave, Superior, Douglas County, Wisconsin, FID 816009590, submitted to the Department of Natural Resources (DNR) a permit application, including plans and specifications for revision of 816009590…
The DNR Air Management Program will host a public hearing for Microsoft Corporation – MKE03/04 and MKE16/17 Data Centers, located at 4800 90th St., Mount Pleasant, Racine County, Wisconsin, FID 252302490.
The Wisconsin Department of Natural Resources (DNR) Air Management Program will host a public hearing for a proposed permit submitted by CHS Oilseed Processing, located in Evansville, Wisconsin.
The permit application is being reviewed under the Prevention of Significant Deterioration (PSD) Program [ch. NR 405, Wis. Adm. Code] for particulate matter (PM; carbon monoxide (CO); Volatile Organic Compounds (VOC)). The proposed project will…
The Department of Natural Resources (DNR) will hold a public hearing to receive public comments on the air pollution control permit application for the construction and operation of a wastewater treatment plant, a digester with an emergency flare…
NOTICE IS HEREBY GIVEN that, pursuant to ss. 285.13(1) and 285.61(7), Wis. Stats, the Department of Natural Resources (DNR) will hold a public hearing to receive public comments on the air pollution control permit application for the construction of…
The DNR will hold a public hearing to receive public comments on the air pollution control permit application for the construction of a non-metallic mineral processing plant, fluid bed sand dryers, and sand storage silos and the revision of Air…
The Department of Natural Resources (DNR) will hold a public hearing to receive public comments on the air pollution control permit application for the construction of an approximately 255-megawatts power project.
BackgroundFacilities that emit air pollution are federally required to obtain construction permits before being constructed, relocated or modified, unless exempt. The DNR’s New Source Review program assists facilities with meeting this requirement…